Project Director, Infrastructure Asset Management
Joined: 2017
and access,
Alex Brosseau is responsible for overseeing day-to-day construction, commissioning and operating activities of Fengate’s power generation assets. Alex has focused primarily on the 40MW biomass fired power plants in Fort St. James and Merritt, British Columbia, and as well the Central Utility Block, part of the Heartland Petrochemical Complex located in Fort Saskatchewan Alberta. Prior to joining Fengate in 2017, Alex was a member of the Owner’s Engineer on the aforementioned biomass power plants, managing interconnections with the local utilities and implementation of an EPC Contract. Alex holds a professional engineering designation in the provinces of Alberta and British Columbia, and is actively pursuing his MBA at the University of Alberta.